Online booking
Book a site visit
Choose the day and time that suit you for an on-site consultation and survey. The visit is paid online, and a Light Plast specialist will call to confirm and to prepare your quote.
Select a date and time
October 2026
Mo
Tu
We
Th
Fr
Sa
Su
Pick a day in the calendar to see the available times.
On-site travel and survey policy
We take measurements and assess your site in person to recommend a suitable technical solution and provide an accurate estimate.
How does it work?
Without a confirmed order, the county-based fee covers return travel, logistics and the on-site technical assessment and measurements. Pay online when booking.
If you commission the project with us, the entire survey fee is deducted from the total project price.
| County / Bucharest | Visit cost |
|---|---|
| București | 50 RON |
| Ilfov | 100 RON |
| Prahova | 190 RON |
| Giurgiu | 200 RON |
| Dâmbovița | 230 RON |
| Teleorman | 250 RON |
| Buzău | 290 RON |
| Argeș | 330 RON |
| Călărași | 240 RON |
| Ialomița | 250 RON |
| Brașov | 400 RON |
| Olt | 450 RON |
| Vâlcea | 450 RON |
| Vrancea | 450 RON |
| Covasna | 520 RON |
| Brăila | 550 RON |
| Constanța | 600 RON |
| Dolj | 620 RON |
| Galați | 650 RON |
For counties not listed, contact us to confirm the travel fee.
Frequently asked questions
- How much does a survey visit cost?
- Without a confirmed order, the fixed travel and survey fee is RON 50 in Bucharest and RON 100–650 in the listed counties. It covers return travel, logistics and measurements. If you commission the work with us, the full fee is deducted from the project total. If you have accepted our quotation and paid the project deposit, final measurements are included with no additional charge; arrange the visit directly with your representative.
- How long does a visit take?
- An initial assessment and survey typically takes 45 minutes to 2 hours. Outside Bucharest / Ilfov, your representative will provide an estimated arrival window based on travel distance and traffic. Your selected time is confirmed by the specialist.
- What affects the duration of an on-site visit?
- The size and layout of the site, multiple openings, unusual shapes and complex architectural details require more measurement and structural verification time. Discussions about technical solutions, materials or changes can extend the consultation. Difficult access and unprepared spaces can also lengthen the assessment.